AI-POWERED PROCUREMENT FOR UTILITY-SCALE RENEWABLES

The future of utility-scale
renewable procurement.

AI-driven, verified, and auditable. A closed B2B platform connecting EPCs, developers and investors with vetted suppliers on solar PV and BESS projects of 20MW and above.

PROVEN · RATED · TRUSTED ACROSS RENEWABLES
EPCs
·
PROJECT DEVELOPERS
·
INSTITUTIONAL INVESTORS
·
TIER-1 MANUFACTURERS
·
PROJECT LOGISTICS
·
BANKABILITY DESKS
EPCs
·
PROJECT DEVELOPERS
·
INSTITUTIONAL INVESTORS
·
TIER-1 MANUFACTURERS
·
PROJECT LOGISTICS
·
BANKABILITY DESKS
By the numbers

Procurement is 70–80% of project cost.

Still the least optimised, most fragmented stage of every utility-scale build. EnerProcure changes that.

0MW+
Minimum project scale
0%
Of project cost is procurement
0–7 days
From RFQ to formal quotes
0/7
AI procurement assistant
What EnerProcure is

A closed B2B platform for vetted utility-scale procurement.

From a 25MW solar farm in the UK to a 400MW project in Southern Africa, EnerProcure simplifies and accelerates the procurement process with automation, real-time data and deep intelligence.

EPCs

Engineering, Procurement and Construction firms running multi-site portfolios.

Developers

Project developers on large-scale solar and battery installations.

Investors

Institutional capital that demands accountability and bankable evidence.

Vetted Suppliers

Major brands and rising high-tech manufacturers — quality-assured components.

How the platform works

Twelve steps from BOM to award to delivery.

One continuous, audited workflow — no broker chains, no lost email threads, no spreadsheets to reconcile.

  1. Step 01

    EPC or Developer signs up

    Buyers register and go through vetting. All access is invitation-led and verified.

  2. Step 02

    BOM upload

    A full Bill of Materials is uploaded — spreadsheet or structured form.

  3. Step 03

    AI Review & Analysis

    AI scans the BOM, validates data, checks for missing or inconsistent specs and prompts buyers to clarify fields (cable meterage, frame format, warranty duration).

  4. Step 04

    Intelligent Supplier Matching

    Only relevant suppliers are notified of line items inside their scope (e.g. 595W modules).

  5. Step 05

    Instant Notifications

    Qualified suppliers receive alerts for live quotation opportunities.

  6. Step 06

    Supplier Quotations

    Suppliers log in and submit quotes. All formal quotations returned within 5–7 working days, itemised and time-stamped.

  7. Step 07

    Buyer Comparison & Shortlisting

    Side-by-side normalised comparison on price, lead time, warranty and ESG. AI recommendation as a second opinion.

  8. Step 08

    Live Price Snapshots

    Real-time market reference points anchor every negotiation.

  9. Step 09

    Secure Communication Portal

    Per-RFQ threads with the buyer, supplier and logistics partner — replacing parallel email chains.

  10. Step 10

    Order Placement & Logistics

    Orders handled on CIF terms. Integrated logistics support triggered on request with in-platform tracking.

  11. Step 11

    Damage & Dispute Management

    Buyers upload evidence of damage or discrepancies. AI guides issue assessment; suppliers notified instantly.

  12. Step 12

    Feedback & Supplier Scoring

    Buyers rate supplier performance after every order. Builds a transparent, performance-led marketplace over time.

01
02
03
04
05
06
07
08
09
10
11
12
Built around AI

A procurement assistant, engineer and sales coordinator — combined.

Ask a question at 2 AM — get an answer at 2:01. Every step logged, every alternative surfaced, every compliance flag raised.

?

Does this 1500V inverter comply with IEC 62109?

EnerProcure AI

Yes — three matched suppliers carry IEC 62109-1 and -2 certifications, with lab reports verified through our document vault.

?

What's the operating temperature range for this panel?

EnerProcure AI

−40°C to +85°C per the datasheet, with a 0.34%/°C power temperature coefficient. Suitable for MENA deployments.

?

How long is the warranty on this storage unit?

EnerProcure AI

10-year product warranty, 15-year performance warranty at ≥70% capacity retention, backed by manufacturer P&I.

?

Is this cable UV resistant, and what standard does it meet?

EnerProcure AI

UV-rated to EN 50618 / TÜV 2 Pfg 1169, with double-insulated XLPO sheathing for outdoor PV strings.

Every step logged

Implement-grade audit trail across every quote, message and award.

Suggests Compatible Alternatives

Recommends approved alternates when a line is unavailable — keeps decisions moving.

24/7 Availability

No waiting days for overseas clarifications. Instant answers, every time zone.

Our philosophy

Level the field without lowering the standard.

There's room for both legacy brands and breakthrough players. Our AI doesn't push popular names — it recommends based on the criteria that actually determine project outcomes.

Specification accuracy

Bankability

Performance metrics

Delivery timelines

Warranty standards

Certifications & compliance

Key benefits

One platform, four operating advantages.

Efficiency

Automating procurement reduces manual effort, speeds decision-making and minimises errors.

Comprehensive offerings

Suppliers and logistics providers on one platform creates a true one-stop shop.

Transparency

Suppliers only see relevant info, fostering trust and clean competitive tension.

Scalability

Easily expand with new suppliers, products and services as the business grows.

Why this matters globally

The renewable market is growing faster than expected.

Projects are larger, timelines tighter, and expectations higher. Developers in emerging markets — Africa, Latin America, Southeast Asia — face limited supplier networks and high risk premiums. EnerProcure closes that gap.

0–80%
Of utility-scale project cost
0MW
Single-project scale supported
0+ regions
EU · MENA · Sub-Saharan Africa
0%
Vetted supply network
THE FUTURE OF PROCUREMENT

Build with discipline.
Deliver with evidence.

Access to EnerProcure is invitation-only. Verified buyers, vetted suppliers and credentialled logistics partners — apply for access today.

Platform security

EnerProcure runs on enterprise infrastructure that maintains the following standards

  • ISO 27001Information security
  • SOC 2 Type IITrust services criteria
  • UK GDPRData protection
  • AES-256Encryption at rest

Hosted on enterprise infrastructure that maintains ISO 27001, SOC 2 Type II and UK GDPR compliance. All data is encrypted in transit (TLS 1.3) and at rest (AES-256). These accreditations are held by our platform provider.